Project Status: Active or in Progress
Schedule: November 2020, Tree Clearing and Invasive Species Removal; Summer 2021, Construction; Fall 2021, Completion

Dane County Parks is restoring approximately 4,900 feet of stream on a channelized section of Badger Mill Creek, a class II trout stream, within the Ice Age Junction Natural Resource Area. The project will be done in conjunction with the City of Verona’s East Side Interceptor Gravity Sanitary Sewer Project.  Verona has hired Minger Construction for completing both projects.

The stream restoration project will restore trout habitat using several techniques. Trees that are cleared for the City’s project will be used for habitat structures called log sills and deflectors. These structures will increase depth by narrowing the stream channel, increase sinuosity within the channel, and provide in-stream shelter and resting areas for trout. Rock deflectors will also be added that will create another habitat type, mainly increasing velocities, scouring, improving dissolved oxygen levels with turbulence, and reducing water temperatures by increasing depths/velocities.

Another aspect of the stream restoration project includes reconnecting the stream to its floodplain. This will be done by sloping back the banks and removing berms in key areas along the corridor. These improvements will allow water and energy from the river to spill onto the floodplain and dissipate rather than containing it within the stream channel and causing bank erosion during large events. 

Dane County Parks and the City of Verona are working closely with the Ice Age Trail Alliance on mitigating impacts to the Ice Age National Scenic Trail that runs through the corridor. This section of the trail will be closed for the duration of the project.

Verona hosted a neighborhood information meeting on January 13th, 2021.  The presentation included topics including but not limited to the history of the sewer, sewer route, Ice Age Trail, restoration efforts and Dane County’s stream restoration project.  The presentation was broadcasted on the City YouTube channel and the presentation is included in the Plans/Documents section below.

Upcoming Meetings:
Verona has scheduled monthly neighborhood (public) progress meeting that will occur on the third Wednesday of the month at 5pm starting January 20, 2021 and the last meeting occurring on September 15, 2021. These meetings will include a schedule update on the project and then open dialog for questions from the public. Questions are encouraged to be asked. 

https://zoom.us/j/98510880099
or by phone
+1 312 626 6799
Webinar ID: 985 1088 0099

 

Contact

Questions can be made by phone, mail or email to:

Sara Rigelman, Park Property Planner
Dane County Land and Water Resources Department - Parks Division
5201 Fen Oak Drive
Madison, WI 53718
rigelman@countyofdane.com
(608) 212-1235